Active and Passive Networks

The backbone for the infrastructure that include Cables, Patch Panels, Switches, Routers, IPT.
AVIT implemented/ implements Active and Passive Networks in many projects in the following Airports:

  • Cairo International Airport (TB1)
  • Cairo International Airport (TB2)
  • Cairo International Airport (TB3)
  • Sharm El Sheikh Airport.
  • Ghurgada Airport.
  • Luxor Airport. (LUX)
  • Katamya Airport (New Capital)
  • Sphinx Airport. (SPX)
  • Bardawel Airport.
  • Saint Catherine Airport. (SCA)
Read more...  

Al Bardawil International Airport

Al Bardawil International Airport


Client:
CONTRACK


Owner:
Egyptian Armed Forces


Project description:

Al Bardawil Airport Terminal Building.

Al Bardawil Airport North Sinai, Egypt is a military airport that will be opened for civil flights; Al Bardawil airport will receive charter flights, along with Cairo International Airport to ease pressure.

AVIT Scope of Work:

As an a complete solutions provider, AVIT works as Master system integrator through Infrastructure, light current, security systems and special Airport systems.


soluation:

SCS :- Structure Cabling System.
DNE :- Data Network Equipment.
BMS :- Building Management System
TOIP :- Telephony Over IP System.
IPTV:- IP Television System.
FAS :- Fire Alarm System.
PAS :- Public Address System.
MCS :- Master Clock System.
CCTV :-Closed Circuit TV System.
AV :- Audio – Video System.
ACS:- Access Control Solution.
SE :- Security Equipment.
CUPPS:- Common Use Passenger Processing System.
AODB:- Airport Operational Data Base System.
AVAS Automatic Voice Announcement System.
LDCS Local Departure Control System.
Metal Detector Gates.
In Line Screening for BHS system.
X-rays equipment/system.

Read more...  

Capital International Airport

Capital International Airport


Main Contractor:
Hassan Allam Sons Group.


Owner:
Egyptian Armed Forces


Project description:

The Mega Project of the terminal building of Capital International airport and land facilities with capacity of 1 Million passenger /year (expandable) that aims to serve petroleum companies private jets and Air Taxi flights ,terminal building comprises a ground floor (3,500 m2) .

.

AVIT Scope of Work:


As an ‘A to Z solutions provider, AVIT works as Master system integrator through Infrastructure, light current, security systems and special Airport systems.


soluation:

SCS :- Structure Cabling System.
DNE :- Data Network Equipment.
BMS :- Building Management System
TOIP :- Telephony Over IP System.
IPTV:- IP Television System.
FAS :- Fire Alarm System.
PAS :- Public Address System.
MCS :- Master Clock System.
CCTV :-Closed Circuit TV System.
AV :- Audio – Video System.
ACS:- Access Control Solution.
SE :- Security Equipment.
CUPPS:- Common Use Passenger Processing System.
AODB:- Airport Operational Data Base System.
AVAS Automatic Voice Announcement System.
LDCS Local Departure Control System.
Metal Detector Gates.
In Line Screening for BHS system.
X-rays equipment/system.

Read more...  

Sphinx Airport

Sphinx Airport


Client:
EAC .


Main contractor:
Orascom Construction .


Project description:
Sphinx Terminal Airport is a military airport that will be opened for civil flights, the airport will receive charter flights, along with Cairo International Airport to ease pressure.


AVIT Scope of Work:
As an ‘A to Z solutions provider, AVIT works as Master system integrator through Infrastructure, light current, security systems and special Airport systems.


soluation:

DNE :- Data Network Equipment.
TOIP :- Telephony Over IP System.
BRS :- Baggage Reconciliation system.
FIDS :- Flight Information Display System.
CUPPS:- Common Use Passenger Processing System.
AVAS Automatic Voice Announcement System.
LDCS Local Departure Control System.

 

Read more...  

Arinc-Cairo Airport building Terminal 2

Video Streaming Solution at Cairo Airport Terminal # 2


AVIT Scope of Work:
Delivery, Installation, Testing, Training, commissioning and Handover of Video streaming solution at Cairo Airport Terminal Building # 2 including delivery and installation of the following :
- Video Streaming , Management and Recording servers
- Head End IPTV Gateways

Project Challenges :

Providing the most advanced video streaming solution

Read more...  

Hurghada International Airport

New terminal building and landside facilities:

The Hurghada international airport is the second busiest airport in Egypt after Cairo International Airport.
Construction of a new terminal complex at a cost of $300 million with an annual passenger capacity of 7.5 million and will reach up to 13 million passengers annually after the expansion .It includes 11 gates linked to passenger boarding bridges and new passage way for the biggest planes worldwide and will be an alternative for landing of planes in case of emergency at Cairo Airport.

Read more...  

Sohag International Airport

It is located in Sohag Governorate; 25Km south of Sohag. It was officially inaugurated on 25th May, 2010. It is designed to handle approx 3.5 million passengers/year.

With our skilled team, AVIT has succeeded to apply the most advanced and latest infrastructure technology and airport systems in Sohag International Airport as one of the leading aviation companies in Egypt, offering not only equipment but also a fully integrated solution including design, implementation, testing and SLA as well.

Read more...  

Family Smart Cards

This project is related to the Smart/Complex Business Segment for the Ministry of State for Administrative Development (MSAD). It started on 1st January, 2009. AVIT Team has successfully implemented the solution of the first phase (4 Governorates) and the second phase (9 Governorates).

Read more...  

Borg El Arab, Assiut and Hurghada (extension) Airports & CCC

Borg El Arab, Assiut and Hurghada (extension) Airports & CCC

AVIT has succeeded to apply the most advanced and latest infrastructure technology and airport systems in the three Airports as one of the leading aviation companies in Egypt, offering not only equipment but also a fully integrated solution including design, implementation, testing and SLA as well.

Read more...  

Maintenance and Technical Support

Client
SITA.

AVIT Scope of work

Maintenance and Technical Support of Airport Systems at four Airports (Hurghada, Borg El Arab New Terminal, Assiut, Souhag) and New CCC at Egyptian Airports Company, for (3) years period.

Read more...  

Infrastructure

Client

Ministry of Civil Aviation

AVIT Scope of work

Blade Servers for Data Center.
Security Surveillance / Digital Cameras.
Safeguard and secure of Information Network.

Read more...  

Development of CUTE System

Client

Ministry of Civil Aviation

AVIT Scope of work

Development of CUTE System at five Airports (Sharm El Sheikh T1 & T2, Borg El Arab Old Terminal, Luxor, Aswan, Abu Simbel.

 

Read more...  

Newsletter registration

Contact Us

Head Office
Address: Egyptian Holding Company for Airports & Air Navigation Building,
Airport Road, Cairo, Egypt.
P.O. Box: 17 Cairo Airport 1
Post Code: 11776
Tel.: + 20(2) 2 696 0 603
Fax: + 20(2) 2 696 0 686
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Service Desk
Phone: +20(2) 2 696 0 696
Fax: +20(2) 2 696 0 686
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

This email address is being protected from spambots. You need JavaScript enabled to view it.

Top of Page